A cutter dredger can deliver the dredged material in the following maer:
1. by discharge to reclamation ashore via combinations of floating pipeline, submerged pipeline
and shore pipeline;
2. by discharge into a hopper barge moored alongside the dredger (if so designed);
3. by crushing the material and leaving it on the seabed for subsequent removal by a trailer
dredger;
6. by “rainbowing” from the stern of the dredger;
7. by discharging through a spreader pontoon for accurate underwater placement.
The method adopted depends on the project work requirements
_qtyq.jpg)
_e6e2.jpg)
برچسب:
نویسنده: غزل ایمانی